PLUG FOAM B is a foam system in the form of two liquids. This liquid when mixed with PLUG FOAM A together fonn a rigid urethane foam.
Product Specification
- Temperature : Detennined under laboratory conditions at 20 C
- Mix ratio, Part B : 1.0 kg
- Cream time : 15 to 18 seconds
- Gel time : 60 to 65 seconds
- End of Rise : 70 seconds
- Tack Free Time : 80 to 90 seconds
Information Request